Vela and Tekla Add Supply Chain to BIM - Cadalyst AEC
Integrating Technology for Manufacturing, AEC and GIS
Cadalyst Planroom
Cadalyst AECCadalyst GISCadalyst ManufacturingCadalyst ManagementCadalyst - Discussion ForumsCadalyst - CAD TipsCadalyst Labs ReviewsCadalyst - PlanroomCadalyst - Integrating Technology for Manufacturing, AEC and GIS
CLASSIFIEDS
 Featured Classified
  • First Cut Prototype CNC machines real plastic parts.
  • Reduce field survey costs with GPS2CAD.
Browse by Category
  •  3D Translation
  • CAD Services
  • Scanning and Conversion
  • Training
Browse by Company
  • Advanced Solutions, Inc
  • CADSofttools
  • CADWorks
  • Industrial Press, Inc
  • Large Document Solutions
  • Okino Computer Graphic
  • PhotoModeler
  • Q-CAD Drafting Services
  • Softcover International Ltd
  • Wright Document Services

Vela and Tekla Add Supply Chain to BIM
RFID-based Field BIM solution enables users to visualize the field-based supply chain as part of the building information model.


Vela Systems, developer of mobile field software for the AEC industry, and Tekla, provider of building information modeling (BIM) software, announced the release of a joint Field BIM solution that reportedly can improve the management of construction projects.

The solution integrates Vela's mobile field software installed on tablet PCs with Tekla's BIM solution, Tekla Structures for Construction Management. When combined with field software and radio frequency identification (RFID), stakeholders in a construction project can manage building components and visualize the supply chain through a 4D simulation in which the fourth dimension is time. The joint Field BIM solution allows AEC users to feed the ever-changing status of the field-based supply chain into the actual building information model.

Skanska Building USA recently integrated the new solution using RFID technology as it oversaw the $998-million design-build project to construct the open-air Meadowlands Stadium in New Jersey. Skanska used the joint Field BIM solution to capture information about building materials from vendors and merge it in the building information model. The company states that it expects to expedite the Meadowlands building schedule by 10 days and produce $1 million in cost savings.

"Integrating BIM and RFID shows a genuine advancement of project-management technologies," said Stacy Scopano, business development manager of the Contractor Segment at Tekla. "Making critical aspects of supply chain management and field coordination centralized -- and now even visual -- represents a very significant step forward for technology-enhanced project control."

The Tekla/Vela solution is available immediately and is being jointly marketed by both companies.


Share Your Feedback About This Article
Post your comments to a Cadalyst Discussion Forum
or send them directly to the Cadalyst editors.
LATEST AEC NEWS
Oracle Prepares to Buy Primavera
Autodesk Debuts 64-bit Revit 2009
CCE Adds New Assembly Features to EnSuite
Current Issue
Cadalyst Current Issue
   New This Month
   Past Issues
   Read or Subscribe to
    Cadalyst Digital Edition
RSS Feed

Get instant delivery of our latest news! z

Click here to get RSS feeds from other Cadalyst sites.

FEATURED CLASSIFIED
  • The Leader in 2D and 3D Design Software.
CADALYST E-NEWSLETTERS
Subscribe Now!
  • Harry's Code Class
  • Tips & Tools Weekly
  • CAD Manager's
   Newsletter
  • AEC Tech News
  • GIS Tech News
  • Acrobat Insider


Click here